Project code |
Company
Field of activity |
Project Name |
Estimated value
(EUR million) |
Total |
External
sources |
|
Nuclearelectrica S.A. Bucuresti
Producing of electrical and thermal energy by nuclear and classic method, selling of electrical and thermal energy, producing and selling of nuclear fuel, independent risk analyses for nuclear security, environmental impact analyses. |
Continuation of the works for achieving Unit 3 and 4 of 700 MW Cernavoda Nuclear Power Plant: |
2000.00
|
2000.00
|
|
R.A.A.N. subsidiary ROMAG Prod Tr. Severin
Producing and selling of heavy water for nuclear installation. |
Completion and bring into operation of G-S installation heavy water production-line 2: |
|
18.00
|
|
R.A.A.N. subsidiary ROMAG Prod Tr. Severin
Producing and selling of heavy water for nuclear installation. |
Facility for Deuterium Depleted Water production |
3.90 |
3.90 |
|
R.A.A.N. subsidiary ROMAG Prod Tr. Severin
Producing and selling of heavy water for nuclear installation. |
Facility for Oxygen 18 production |
1.60 |
1.60 |
|
R.A.A.N. subsidiary ROMAG Prod Tr. Severin
Producing and selling of heavy water for nuclear installation. |
Instalation for bio-diesel manufacturing |
3.50 |
3.50 |
|
R.A.A.N. subsidiary ROMAG Prod Tr. Severin
Producing and selling of heavy water for nuclear installation. |
Facility for solid Natrium Sulphide production |
0.30 |
0.30 |
|
R.A.A.N. subsidiary ROMAG Termo Tr. Severin
Heat and electricity generation and marketing for industrial and domestic purposes. |
Installing of 100 MW turbo-generator using the 420 t/h boiler no. 7 as a source:
|
62.00
|
62.00
|
|
R.A.A.N. subsidiary ROMAG Termo Tr. Severin
Heat and electricity generation and marketing for industrial and domestic purposes. |
Plant for discharging ash and slag to dense slurry: |
32.50 |
32.50 |
|
R.A.A.N. subsidiary ROMAG Termo Tr. Severin
Heat and electricity generation and marketing for industrial and domestic purposes. |
Plant for sulphur removal from flue gas at chimney: |
134.00 |
134.00 |
|
R.A.A.N. subsidiary ROMAG Termo Tr. Severin
Heat and electricity generation and marketing for industrial and domestic purposes. |
Plant for powder reducing from flue gas: |
11.00 |
11.00 |
|
R.A.A.N. subsidiary ROMAG Termo Tr. Severin
Heat and electricity generation and marketing for industrial and domestic purposes. |
Plant for NOx reducing from flue gas: |
4.20 |
4.20 |
|
R.A.A.N. subsidiary ROMAG Termo Tr. Severin
Heat and electricity generation and marketing for industrial and domestic purposes. |
Heat distribution stations and heating secondary networks modernization in Drobeta Turnu Severin |
26.70
|
18.30
|
|
R.A.A.N. subsidiary ROMAG Termo Tr. Severin
Heat and electricity generation and marketing for industrial and domestic purposes. |
Flower and vegetable greenhouses |
23.00 |
23.00 |
|
Hidroelectrica S.A. Bucuresti
Generation and selling of electric power, power system services (frequency - power control, provision of both static and dynamic reserve), raw water supply and water management services (flow regulation, flood protection, flow availability control, import-export operations, electricity counter trade). |
Borca - Poiana Teiului hydropower development, Galu HPP, Frumosu location:
- total:
- of which for electric power supply: |
37.60
33.60
|
37.60
33.60
|
|
Hidroelectrica S.A. Bucuresti
Generation and selling of electric power, power system services (frequency - power control, provision of both static and dynamic reserve), raw water supply and water management services (flow regulation, flood protection, flow availability control, import-export operations, electricity counter trade). |
Hydropower development of the Siret River on Cosmesti Movileni stretch:
- total:
- of which for electric power supply: |
76.30
68.70
|
76.30
68.70
|
|
Hidroelectrica S.A. Bucuresti
Generation and selling of electric power, power system services (frequency - power control, provision of both static and dynamic reserve), raw water supply and water management services (flow regulation, flood protection, flow availability control, import-export operations, electricity counter trade). |
Hydropower development of the Jiu River on Valea Sadului - Vadeni stretch:
- total:
- of which for electric power supply: |
116.50
46.60
|
116.50
46.60
|
|
Hidroelectrica S.A. Bucuresti
Generation and selling of electric power, power system services (frequency - power control, provision of both static and dynamic reserve), raw water supply and water management services (flow regulation, flood protection, flow availability control, import-export operations, electricity counter trade). |
Hydropower development of the Strei River on Subcetate - Simeria stretch:
- total:
- of which for electric power supply: |
165.70
145.70
|
165.60
145.70
|
|
Hidroelectrica S.A. Bucuresti
Generation and selling of electric power, power system services (frequency - power control, provision of both static and dynamic reserve), raw water supply and water management services (flow regulation, flood protection, flow availability control, import-export operations, electricity counter trade). |
Hydropower development on the Olt River on Fagaras -Hoghiz stretch:
- total:
- of which for electric power supply: |
103.50
28.00
|
103.50
28.00
|
|
Hidroelectrica S.A. Bucuresti
Generation and selling of electric power, power system services (frequency - power control, provision of both static and dynamic reserve), raw water supply and water management services (flow regulation, flood protection, flow availability control, import-export operations, electricity counter trade). |
Rastolita hydropower development: |
106.50 |
106.50 |
|
Hidroelectrica S.A. Bucuresti
Generation and selling of electric power, power system services (frequency - power control, provision of both static and dynamic reserve), raw water supply and water management services (flow regulation, flood protection, flow availability control, import-export operations, electricity counter trade). |
Pump storage HPP Tarnita – Lapustesti: |
780.00 |
780.00 |
|
Turceni Power Complex - Gorj County
Generation and supplying of electricity and heat based on lignite, extraction and preparation of lignite |
Rehabilitation and modernization of units no. 3 and 4 of 330 MW from Turceni TPP: |
371.00
|
300.00
|
|
Turceni Power Complex - Gorj County
Generation and supplying of electricity and heat based on lignite, extraction and preparation of lignite.
|
Dense fluid slug and slurry evacuation: |
70.00
|
70.00
|
|
Rovinari Power Complex, Gorj county
Generation and selling of electricity and heat based on fossil fuels, heat transport and distribution in district heating system managed by the company. |
Flue gas desulfuration plants from units no. 3, 4, 5 and 6 of 330 MW from Rovinari TPP: |
240.00
|
168.00
|
|
Rovinari Power Complex, Gorj county
Generation and selling of electricity and heat based on fossil fuels, heat transport and distribution in district heating system managed by the company. |
New anh and slag deposit Garla realized in dense slurry fluid of SC Complexul Energetic Rovinari SA |
64.44
|
45.11
|
|
Rovinari Power Complex, Gorj county
Generation and selling of electricity and heat based on fossil fuels, heat transport and distribution in district heating system managed by the company |
New high power unit (500MW) of the SC Complexul Energetic Rovinari SA |
625.00
|
437.50
|
|
Craiova Power Complex, Dolj county
Generation and selling of electricity and heat based on fossil fuels, heat transport and distribution in district heating system managed by the company. |
Erection of a new cogeneration 150MW units, using modern technologies' of the S.C. Complexul Energetic Craiova S.A. |
125.0
|
100.0
|
|
Craiova Power Complex, Dolj county
Generation and selling of electricity and heat based on fossil fuels, heat transport and distribution in district heating system managed by the company. |
Dense fluid slug and slurry evacuation installation for units no. 7 and 8 of 315 MW from Isalnita TPP: |
24.00
|
16.00
|
|
Craiova Power Complex, Dolj county
Generation and selling of electricity and heat based on fossil fuels, heat transport and distribution in district heating system managed by the company. |
Flue gas desulphuration implementation for units no. 1 and 2 from Craiova II CHPP: |
66.00
|
49.00
|
|
Craiova Power Complex, Dolj county
Generation and selling of electricity and heat based on fossil fuels, heat transport and distribution in district heating system managed by the company. |
Flue gas desulphuration implementation for unit no. 8 of 315 MW from Isalnita TPP: |
50.00
|
34.00
|
|
Craiova Power Complex, Dolj county
Generation and selling of electricity and heat based on fossil fuels, heat transport and distribution in district heating system managed by the company. |
Increasing the stability of slag and ash pond using dense fluid technology, Craiova II CHPP: |
26.00
|
16.00
|
|
Termoelectrica S.A. Bucuresti
Generation and selling of electricity and heat based on fossil fuels, heat transport and distribution in district heating system managed by the company. |
Flue gas desulphuration implementation at unit no. 4 of 150 MW from Paroseni CHPP: |
34.00
|
34.00
|
|
Termoelectrica S.A. Bucuresti
Generation and selling of electricity and heat based on fossil fuels, heat transport and distribution in district heating system managed by the company. |
New condensing unit of about 150 MW at Doicesti TPP in a modern and clean technology, according with the local coal supply: |
155.00
|
155.00
|
|
Electrocentrale S.A. Bucuresti
Generation and selling of electricity and heat based on fossil fuels, heat transport and distribution in district heating system managed by the company. |
Modernization of the primary district heating network in the municipality of Constanta: |
51.00
|
43.00
|
ER1.324.06 |
Electrocentrale S.A. Bucuresti
Generation and selling of electricity and heat based on fossil fuels, heat transport and distribution in district heating system managed by the company. |
Rehabilitation of 420 t/h boilers at Bucuresti – Progresu CHPP in order to increase the operation safety and to optimize operation on fuel oil and mixed operation, including low NOx burners: |
30.00
|
30.00
|
|
Electrocentrale S.A. Bucuresti
Generation and selling of electricity and heat based on fossil fuels, heat transport and distribution in district heating system managed by the company. |
New installation with gas-turbine and retrieving boiler in a modern technology which can deliver about 20 Gcal/h of Titan CHPP |
16.00
|
16.00
|
|
Electrocentrale Deva S.A., Hunedoara county
Generation and selling of electricity and heat based on fossil fuels, heat transport and distribution in district heating system managed by the company. |
Rehabilitation of unit no. 1 from Mintia TPP, Deva: |
112.60 |
80.20 |
|
Electrocentrale Deva S.A., Hunedoara county
Generation and selling of electricity and heat based on fossil fuels, heat transport and distribution in district heating system managed by the company. |
Flue gas desulphuration for the 210 MW generation units of Mintia TPP, Deva: |
228.00
|
80.20
|
|
Craiova Power Complex, Dolj county
Generation and selling of electricity and heat based on fossil fuels, heat transport and distribution in district heating system managed by the company. |
NOx emissions reduction to the boiler no. 2 from Craiova II CHPP: |
2.00
|
1.00
|
|
Craiova Power Complex, Dolj county
Generation and selling of electricity and heat based on fossil fuels, heat transport and distribution in district heating system managed by the company. |
Rehabilitation and modernization, including NOx reduction from flue gas, of unit no. 1 of 150 MW from Craiova II CHPP: |
84.00
|
74.00
|
|
Craiova Power Complex, Dolj county
Generation and selling of electricity and heat based on fossil fuels, heat transport and distribution in district heating system managed by the company. |
Rehabilitation and modernization of unit 7 of 315 MW, Isalnita TPP: |
229.00
|
210.00
|
|
Electrocentrale Galati S.A., Galati county
Generation and selling of electricity and heat based on fossil fuels, heat transport and distribution in district heating system managed by the company. |
Rehabilitation of Galati TPP. Refurbishment / modernization of the turbines 3 and 5 and of boilers no. 4 and no. 6 in view of life extension with 150,000 working hours: |
59.70
|
59.70
|
|
Electrocentrale Galati S.A., Galati county
Generation and selling of electricity and heat based on fossil fuels, heat transport and distribution in district heating system managed by the company. |
Asembling of burners with low NOx emission of the 4, 5, 5, 7 and 8th cauldrons |
18.90
|
13.20
|
|
Termoelectrica S.A. Bucuresti
Generation and selling of electricity and heat based on fossil fuels, heat transport and distribution in district heating system managed by the company. |
New unit combined cycle gas - steam of 200 MW at Borzesti TPP, replacing one of the existing units: |
140.00
|
140.00
|